Tenaris has been selected by Equinor, in name of the BM-C-33 consortium, to supply 83,000 tons of 22 and 24 high-grade welded line pipe, tubular accessories, and services for the gas export line of the BMC-33 block, operated by Equinor as part of a consortium with Repsol Sinopec and Petrobras.
Tenaris will showcase its over 30-year presence in the UK North Sea at Offshore Europe, September 5 – 8.
With a deep-rooted interest in sustainability, Manuel Mosconi embarked on a journey to make a difference in the world. Armed with an engineering degree in energy from the Politecnico di Milano, he later pursued a master's in renewables and environmental sustainability, cementing his commitment to protecting the environment.
Tenaris is celebrating the 30th anniversary of its welded pipe mill in Hickman, Arkansas, and the restart of its Blytheville facility.
Tenaris has started up a new manufacturing line for the production of its premium series of AlphaRod® at its industrial center in Veracruz, Mexico. The second line, an investment of US$ 5 million, brings additional capacity to serve the growing market in North America.
Tenaris Pipeline Technology Senior Director, Philippe Darcis, took part in a workshop at the Rio Pipeline 2023, held this week in Rio de Janeiro, Brazil, from August 8th to 10th, addressing the risks and challenges associated with the transport of hydrogen and carbon dioxide in pipelines.
Tenaris