Tenaris received a “Climate Protection Management and Ambitions” award by customer OMV for its strong CO2 emissions reduction reported as part of the Carbon Disclosure Project.
For the fifth time, Tenaris is reaffirming its commitment to the sustainable principles for steel production by signing worldsteel’s newest Sustainable Development Charter.
Romanian operator Black Sea Oil & Gas (BSOG) chose TenarisHydril EasyDock™ weld-on connector for the conductor string of the development phase of the Ana gas field in the Black Sea shallow waters.
During the recent CCUS 2022 Conference organized by the Society of Petroleum Engineers (SPE) Aberdeen, current CCUS projects, case studies, technical initiatives, operating practices were shared and discussed among energy professionals.
Tenaris is advancing safety and efficiency at the rig with the launch of the Automatic Anti-Rotational Keys (AARK) for its BlueDock® premium weld-on connector. This innovation eliminates all manual operations associated with the Anti-Rotational Keys activation, reducing risks and improving running speeds.
Tenaris plans to invest $190 million for the construction of a wind farm located in Adolfo Gonzáles Chaves, in the province of Buenos Aires, Argentina.
Tenaris