Tenaris has entered the construction phase of its second wind farm in Olavarría, Argentina, known as La Rinconada. This new facility will feature 21 wind turbines with a total installed capacity of 94.5 megawatts.
Two strings with Dopeless® technology were successfully installed in the Búzios offshore field, operated by Petrobras in Brazil’s Pre-Salt region, marking the first use of Tenaris’s dope-free solution for large-diameter connectors.
Tenaris has certified an Environmental Product Declaration (EPD) for its seamless steel pipes, reinforcing its commitment to transparency and sustainability across its global operations.
Tenaris’s steelmaking facility located in Koppel, Pennsylvania, has successfully completed the ISO 14001 and ISO 45001 certifications, aligning with the highest global standards for environmental and safety management.
With a capacity of 20 MW, the project harnesses renewable energy and converts it into electricity through photovoltaic panels, serving as energy source for the steel shop in Călărași.
Tenaris is a worldsteel Sustainability Champion for eighth consecutive year
Luca Zanotti, Tenaris US President, and Guillermo Moreno, Chief Commercial Officer for the US, received the award on behalf of Tenaris. Tenaris