At the Artificial Lift Conference & Exhibition 2026 (ALCE 2026), Tenaris will showcase technologies and engineering capabilities focused on enhancing reliability, extending equipment life and supporting higher production rates in demanding rod-lift applications.
Dario Códega and Patricia Barrios from Tenaris’s technical team presented two papers at the SPE Latin American and Caribbean Petroleum Engineering Conference (LACPEC) in Rio de Janeiro in June 2026, drawing on 3.4 million meters drilled and 3,100 strings installed.
To provide an additional level of support that enables customers to execute casing runs safely, efficiently, and with confidence, Tenaris launched its Remote Monitoring Center at its North American headquarters in Houston, Texas, two years ago.
Tenaris announced today that operations have started at its new service center in Suriname, built to support the GranMorgu project, the country’s first major offshore development, operated by TotalEnergies, with APA Corporation and Staatsolie Maatschappij Suriname N.V. as partners. Located in Paramaribo, the center will provide integrated services for offshore operations, reinforcing Tenaris’s commitment to the development of Suriname’s energy sector.
As lateral lengths in unconventional wells continue to increase and drilling schedules become tighter, operators face growing challenges in running production casing to the bottom of the well. To address these challenges, Tenaris technical teams published and presented a technical paper at the Society of Petroleum Engineers (SPE)/IADC Drilling Conference in March 2026, outlining best practices.
Tenaris’s coiled tubing facility has recently manufactured its longest and heaviest 2-5/8” OD string to date, delivering a new 88-metric-ton string for CUDD Pressure Control.
Tenaris