Tenaris has invested $8 million USD ($11 million CAD) to improve safety and advance automation in Canada. This investment, part of an ongoing $72.5 million USD ($100 million CAD) plan for industrial and automation improvements initiated in 2024.
Tenaris will present initial findings from a study conducted in collaboration with IGI Poseidon at the 17th OMC Med Energy Conference, held April on 8-10 in Ravenna, Italy.
The TenarisHydril TBG1™ connection has successfully completed its first field deployment in Alberta, Canada. With an average running speed of 35 joints per hour, 104 joints were run with zero rejects and no breakouts.
Tenaris and IGI Poseidon, a joint venture between Greece’s DEPA International Projects and Italy’s Edison S.p.A., have joined forces to advance the hydrogen transportation via ultra-deep offshore pipelines.
Subsea7 has awarded Tenaris the supply of pipes and coating solutions for the Búzios 9 project, operated by Petrobras in the Santos Basin in Brazil.
Gabriel Podskubka, Tenaris Chief Operating Officer, joined a strategic panel discussion titled “Optimising Operations to Advance Decarbonisation: A Digital and Cultural Shift" at ADIPEC 2024.
Luca Zanotti, Tenaris US President, and Guillermo Moreno, Chief Commercial Officer for the US, received the award on behalf of Tenaris. Tenaris