In preparation for Earth Hour on March 26, 2022, Tenaris Energy Manager, Matteo Castellani, shares Tenaris's efforts to find savings across the company's global industrial footprint to effect sustainable change.
As part of its sustainability projects in the UK, Tenaris’s threading facility and service center in Aberdeen, Scotland, sends its wooden pallets, crates and broken dunnage to Wood RecyclAbility, a local organization that provides tailored training opportunities for adults with additional support needs.
Tenaris is exhibiting at the Argentina Oil & Gas 2022 Expo, held on March 20-23 in Buenos Aires. Through a digital experience, the booth features the latest solutions and projects developed by Tenaris, and sister companies, Tecpetrol and Techint Engineering & Construction.
Tenaris has announced on March 21 2022 its decision to strategically reorganize the activities of its industrial equipment facility in Moreira César, Pindamonhangaba-São Paulo, integrating it into its core business, the manufacturing of steel pipes.
Pola -1, at 19,700-feet deep, is the longest gas well to be drilled by Canacol, the independent exploration and production company extracting onshore natural gas in Colombia. Tenaris's proposed string design was chosen for this critical high pressure & high temperature gas well.
Tenaris’s line pipe technology team has carried out an experimental activity to qualify medium and large diameter pipes of up to X70 grade for high-pressure gaseous hydrogen transportation with a hydrogen content up to 100 percent at 200 bars.
Tenaris